Stage
1
Foundation & Floor
Click on
pics to enlarge. |
|
April 2004
We hired out the foundation to Fred Bruner, semi-retired fellow
who did a fantastic job. The foundation came out level and
square to within a quarter inch and it was done very timely.
If anything is out of line after this, it will be Dave's own
doing.
|
|
Sabine and Dave checking out the job. |
|
|
Our daughter Sabine and her cousin Mike help Dave in laying
the sill plate. |
|
Builder Tip:
Dave uses a fence stretcher and a home-made jig to tighten the floor
boards as he laid them onto the floor joists. |
Dave
laying the floor. The plan is to build the front of the house
first. |
Double click on image to see view. |
|
|
Framing out the "Goal Posts" which will be the wall
joists and 2nd floor joists. Friends came to help stand the
Posts as they are pretty heavy. |
|
|
|