|  | Stage 
                    1 Foundation & Floor
 Click on 
                    pics to enlarge.
 |  | 
               
                | April 2004We hired out the foundation to Fred Bruner, semi-retired fellow 
                    who did a fantastic job. The foundation came out level and 
                    square to within a quarter inch and it was done very timely. 
                    If anything is out of line after this, it will be Dave's own 
                    doing.
 
 | 
               
                |  |   
                    Sabine and Dave checking out the job.  |  | 
               
                |  | Our daughter Sabine and her cousin Mike help Dave in laying 
                  the sill plate. | 
  | 
               
                | 
  Builder Tip: 
              Dave uses a fence stretcher and a home-made jig to tighten the floor 
              boards as he laid them onto the floor joists. |  Dave 
                    laying the floor. The plan is to build the front of the house 
                    first.  |  Double click on image to see view.
 | 
               
                |  |  | Framing out the "Goal Posts" which will be the wall 
                  joists and 2nd floor joists. Friends came to help stand the 
                  Posts as they are pretty heavy. | 
              
                |  |  |  |